Its amazing how quickly things progress once they get started and the eternal rain stops.. Half the building is now water tight and the first section of underfloor heating has been able to go in with the 'floating' floor on top, the dry stone wallers have been doing a fine job of getting the demolished sections of the building back to their former glory, better in some places, and the cottage windows have arrived ready for installation. Meanwhile work inside progresses as the rooms in the barn start to tke shape, it'll be carpets and curtains before we know it!

Topics: '' ''

1 Comment:

Looking good !! wish we were there


Pseudonyms welcome.

Will not be displayed or spammed.

Used to link to you.

The reinstated south elevation
The reinstated south elevation
View from the new study through the main living spaces
View from the new study through the main living spaces

Topics:


Months:



website design and build by dorian