View of the North elevation taken last week with Leck in the foreground measuring the levels for the new drainage system.
It's safe to say theres no shortage of water in the Lake District but we have recently been informed that our plan to install an additional borehole, to provide the new water supply for Lawson Park, has been scuppered.
The subcontractors for this part of the project are now saying the prospects of drilling a successful borehole are low, probably less than 10%. If this is the case we will need to revert back to using a nearby stream, though this should be less primitive than it sounds.
Meanwhile we have appointed engineers (yup more engineers) Burgess Roughton, to resolve the drainage issues at Lawson Park. With large volumes of rainwater passing through the site, over rocky ground on a steep incline, we are extremely conscious of the potential for flooding. Hopefully the new drainage plan they produce will deal with this. At the moment there is much talk of french drains which sound very sophisticated but appears to be simply a ditch filled with stones.
Topics: 'building' 'burgess roughton' 'drainage' 'Lawson Park'
2 Comments:
It looks like there is a lot more of the building still there than it does from the webcam view.
Dorian Moore, May 10, 2008 12:12
yeah the majority of the building is intact the webcam gives quite a distorted view of the demolitions as you can see a large section of the south elevation which has been taken down and all of the internal demolitions, all of this will start to be rebuilt relatively soon.
Lisa Stewart, May 12, 2008 10:35